Skip to main content

Confluence Hall

The Engineering Department is housed in the Confluence Hall building. It was opened on January, 2018. Information about this building is listed below.

  • 68,700 square feet - total
    • 54,700 square feet – mechanical and civil engineering programs
    • 14,000 square feet – Eureka! McConnell Science Museum
  • $26.4 million - funded by CMU with $5.5 million from Eureka!
  • 22 classrooms/labs/shops
    • Includes classroom/lab hybrid rooms; computer labs; project labs; specialty labs; and machining, welding and wood shops
  • Room for student club projects
  • 15-foot wind tunnel
  • Labs and shops filled with leading edge equipment and tools including a hydraulic ironworker, CNC plasma table, tensile machine, optical comparator and much more
  • Green Globes certified for sustainable and energy efficient construction
  • Connected to the campus geo-thermal exchange system
  • General contractor – Shaw Construction
  • Bennett Wagner Grody Architects
Southeast view of Confluence Hall
Confluence Hall
     
Classroom
Classroom
   
Manufacturing Laboratory
Manufacturing Laboratory
  
Materials Science laboratory
Materials Science Laboratory
  
Electronics Laboratory
Electronics Laboratory
  
Student Lounge
Student Lounge